Schedule:

April 11, Preparing Fabric
April 12, Sewing Blocks
April 15, Adding sashing and borders
April 18, Backing and quilt sandwich
April 19, Quilting
April 22, Binding

Finished Quilts and Quilt Tops added to the flickr group by May 16th will be in the drawing for (3) $30 gift certificates to the store.

Who: Hosted by Chris of Frecklemama at Above All Fabric

When: Starts April 11th

What: Get the FREE pattern here and see material requirements below

Why: To make a quilt and bag that we can use this summer!

Add pictures along the way and when you’re finished.  The flickr group is here!


Quilt Supplies:
1 Charm Pack (or cut your own 5 inch squares….you’ll need 36 total)
½ yd Sashing (fabric in between the blocks)
¾ yd Border (fabric along outside)
½ yd Binding (fabric that covers up raw edges when done)
1 1/3 yd Backing
46×46 or larger batting

After we finish the quilt…we will take a short break and then make a super cute bag that has a spot to hold the quilt!  PERFECT for summer trips to the park, beach and more!


Bag Schedule:

May 16th, Preparing Fabric
May 18th, Bag Body
May 19th, Straps and Sleeve
May 20th, Finishing Up

Bag Supplies:
1 1/8 yd Bag Front fabric
1 1/8 yd Bag Lining, Straps & Tie
¾ yd Fusible Fleece
4 yd of 1” wide Cotton Belting

Answers to some questions you may have…..here!

Ideas for more fabric options here!


(if you would like to paste the button on your blog, here is the code:)


<p><a href="http://www.aboveallfabric.com/blog/?page_id=4542"><img title="Above All Fabric Spring Quilt Along" src="http://www.aboveallfabric.com/blog/wp-content/uploads/2011/03/spring-quilt-along-9.jpg" alt="" width="200" height="200" /></a></p>

  18 Responses to “Spring Quilt Along”

  1. [...] set up a Spring Quilt Along Page here….with a Q&A page [...]

  2. Hi, I am Jeanne from The Learning Curve and I love the idea of doing a Quilt Along. I am looking forward to it. Your button link is not working correctly in case someone hasn’t let you know. Thanks so much I M JeanneG

    [Reply]

    Melanie Reply:

    apparently it’s the way the curl on the quotes were formatted?!?! I think it’s all fixed now so blogger blogs should be able to use it.

    [Reply]

  3. [...] (Find more info about the Quilt Along here) [...]

  4. Oh thank you so much for doing this. For once I am going to join along right at the start with the rest of you and really give this a go. Can’t wait for April 11, 2011 and even have it logged on my calendar. What time are you going to start because I’m 5 hours ahead of you guys – I’m in the U.K.
    Patricia xxx
    Pattimyself in Twitter

    [Reply]

  5. [...] working on? Okay, just checking. Now I’ve got it in my head to join in on a quilt-along hosted by Above All Fabric and Chris of [...]

  6. Hi: I dont have a blog but want to get in , can i? please reply me . By the way Im from Puerto Rico.

    [Reply]

    Melanie Reply:

    anyone at all can play along! for sure!!! It’s not something you have to blog about even if you do have a blog also :-) Can’t wait to see everyone’s quilts!

    [Reply]

  7. I am going to play along…I think I already have some charm packs in my stack! Woot Woot…and a bag…wonderful! Can’t wait…..

    [Reply]

  8. I’m joining in! I’m in Australia and it takes hours for us, waiting for you finally getting out of bed!! We’re quite a few hours ahead of you ;-). My 5′ inch squares are waiting to get started!

    [Reply]

  9. It’s already 8.45 pm on this side of the world!

    [Reply]

    Melanie Reply:

    Yes! you’re way ready! lol – it’s only 6:50 here ;-)

    [Reply]

  10. I have my fabric and ready!

    [Reply]

  11. [...] Hi everyone and welcome to the official start of our Spring Quilt-Along!  We will begin by gathering our supplies, arranging our charm squares and cutting the sashing.  If you need a copy of the supply list, please click here. [...]

  12. [...] we start, I want to tell you that a simple schedule has been added here! If you follow along, your quilt will be done by next week….but of course you can work at [...]

  13. [...] According to the schedule, we’re supposed to start on borders and sashing tomorrow, so look for more updates this weekend. Tonight, I need to take a break from sewing to work on a freelance Web development project. How do you balance all your hobbies/work? google.friendconnect.container.setParentUrl('/' /* location of rpc_relay.html and canvas.html */); google.friendconnect.container.renderAdsGadget( { id: 'div-9073574154723622858', height: 200, site: '16777966137706518821', 'prefs':{"google_ad_client":"ca-pub-3655318544242692","google_ad_host":"pub-6518359383560662","google_ad_slot":"9037541802","google_ad_format":"200×200"} }); [...]

  14. [...] even though Chris finished the Quilt-Along posts, you still have time to finish up and add them to the group?  On May 16th we will start the [...]

Leave a Reply